Testing SD-WAN Failover at a Tokyo Office

An evening BCP test with a global IT team

By: eSolia Inc.

An asset management firm's Tokyo office connects to the company network through two software-defined WAN (SD-WAN) edge appliances, a redundant pair, each with its own WAN link. The second appliance and link are there so the office keeps working if fails. In November 2026 the firm's global IT team wanted that shown, as part of its business continuity plan (BCP) testing, and needed someone in the server room to pull the cables. eSolia did the on-site work.

Project parameters

ParameterValue
Team1 eSolia engineer on site; the client's global IT team and its network provider on a conference call
DateOne evening in November 2026, after business hours
Time on siteAbout 3 hours 15 minutes
Scenarios4: each WAN link disconnected, each appliance powered off
ResultNo issues found

What needed solving

A failover design is a claim until someone tests it, which is why BCP and disaster recovery (DR) programs schedule tests like this one. And this test can't be done remotely. The global team could watch the appliances from its consoles, but it couldn't remove a cable in Tokyo, and it couldn't sit at a desk in the office to see whether a call dropped or a print job stalled. The test also had to happen outside business hours and follow the global team's script.

What we did

Our engineer reviewed the global team's test script before the day. On site, he borrowed a staff laptop and started the pre-failover checklist, then joined the call with the global team and the network provider and confirmed the two appliances.

The four scenarios ran at a time, with each connection restored before the next:

  1. Disconnect the WAN cable from the first appliance
  2. Disconnect the WAN cable from the second appliance
  3. Remove power from the first appliance
  4. Remove power from the second appliance

During each he tested from three devices: the borrowed company laptop, the office's IT PC, and his own laptop on the guest network. That covered company-managed devices, the wired LAN and visitors' devices.

The script had 22 checks. Five didn't apply to this office, such as desk phones and the video conference room. The other 17 covered IP configuration, internet connectivity, the security gateway in use, the browser and the intranet, Office applications, Outlook and webmail, voice calls and meetings, Windows Explorer, printing, scan-to-email, firewall policies, a speed test and the office's public IP address. A call stayed up through the scenario tests.

After the fourth scenario he ran the post-failover checklist to confirm the office was back in its normal state, entered the results in the global team's shared sheet, and labeled both appliances so the next person in the server room can tell them apart.

What the client gained

  • Evidence that the office keeps working when it loses either WAN link or either appliance
  • Results recorded in the global team's own format, with command output for the checks that needed it
  • Two labeled appliances
  • No disruption to staff: the test started after 18:30 and the office was back to normal the same evening

For on-site work in Japan directed by an overseas IT team, see On-site Support and Infrastructure.