Skip to main content

Medical Device Maker — 2026-Apr-17

Medical Device Maker

Execute the IT scope of an office relocation under a compressed schedule, covering LAN, rack, circuits, equipment move, and desk setup, with phased decommissioning of the legacy site.

  • Multi-vendor coordination across carriers, cabling, logistics, AV, and MFP over a six-month timeline
  • Phased equipment move via warehouse staging, enabling temporary workspace before full infrastructure readiness
  • Structured cabling, rack mount, and wireless AP installation with port-level continuity and connectivity testing
  • New-site circuit installation and cutover (Internet, WAN/VPN, telephony, FAX)
  • Large-format monitor and MFP setup including uniFLOW and FAX forwarding configuration
  • Legacy site decommissioning, including rack disposal and removal of all carrier services

Related projects