Skip to main content

Project Finder

Use the filters below to browse our complete project history. Search by year or keyword to find projects similar to your needs.

Showing 222 projects

2026-Aug-14

Healthcare Firm

Take a client announcement page to production as a secure, bilingual website on a modern edge platform, with a validated inquiry form, tenant-native email delivery, and an access-controlled staff dashboard.

  • Rebuilt the page for correct Japanese rendering across browsers and devices while preserving the original design
  • Added a bilingual, accessible inquiry form with inline validation and spam-resistant contact handling
  • Routed submissions through the client's own Microsoft 365 tenant under least-privilege permissions, with every submission stored durably
  • Delivered a private, read-only staff dashboard behind Zero Trust access, with edge WAF, DDoS, and bot protection in front of the site
View details →

2026-Aug-12

Finance Firm

Design and stand up a major, bilingual, fully managed cloud security operations center on Microsoft Sentinel, connecting the client's Microsoft and firewall data sources with detection rules, dashboards, and automated alert routing.

  • Built bilingual dashboards spanning incidents, identity, endpoint, email, and cloud apps, deployed via infrastructure-as-code
  • Deployed a curated set of high-severity detection rules with incident grouping to suppress alert-burst noise
  • Consolidated multiple security data sources — directory, extended detection and response, and a firewall — into workspace
  • Built an end-to-end automated alert-routing pipeline to a triage inbox with a severity-based classification policy, backed by an managed-service retainer
View details →

2026-Aug-12

Finance Firm

Build, harden, and operate a major telemetry pipeline that streams AI-tool usage and firewall security events into a cloud SIEM, delivered across two phases with an managed-service retainer.

  • Provisioned and security-hardened a cloud collector (managed identity, just-in-time access, deny-by-default networking) behind a TLS-secured, WAF-protected ingestion endpoint
  • Delivered an AI-tool usage pipeline carrying hundreds of thousands of records with per-user and per-session attribution
  • Added firewall security-event ingestion plus a heartbeat alert if either data stream goes silent
  • Automated the retainer with scheduled jobs for connector-health digests, cost reporting, and schema-change tracking, retaining all operations
View details →

2026-Aug-08

Asset Management Firm

Reinstall and reposition wireless access points across an office floor, relocating units from above the drop ceiling to hanging from it for better coverage and serviceability, with connectivity troubleshooting and verification.

  • Removed and remounted access points below the ceiling using new brackets
  • Retired non-functioning units and relocated an access point to restore coverage in a meeting room
  • Isolated a persistent connectivity fault at the switch and replaced the affected patch cable to resolve it
  • Confirmed every access point associated to the network and operating normally on completion
View details →

2026-Aug-07

Assess a client's Windows laptop fleet and installed software, then define the prerequisites and sequence to complete a secure Microsoft 365 baseline.

  • Reviewed business-grade Windows 11 laptops and their software, confirming a healthy hardware baseline
  • Produced a keep / replace / remove software rationalization on security and data-governance grounds
  • Identified prerequisites to enable disk encryption, directory join, and enforceable tenant policies
  • Delivered a safe self-service inventory procedure and an end-to-end sequence covering MFA enrollment and communications migration
View details →

2026-Jul-30

Finance Firm

Detect, investigate, and contain a QR-code phishing ("quishing") campaign impersonating an internal notice — removing every copy from the client's mailboxes and blocking the sources within a day.

  • Scoped the campaign from a staff report and traced it as the latest in a short related series using the same toolkit, isolating it with a distinctive sender fingerprint
  • Investigated through the client's cloud SIEM and endpoint detection following our own post-incident procedure, verifying no account compromise or data loss
  • Removed all remaining message copies from mailboxes, completing what automated cleanup had left, and confirmed none remained
  • Blocked every sending source, deployed a sender-fingerprint filter that would have caught the whole series, and reinforced staff awareness on reporting and not scanning unexpected QR codes
View details →

2026-Jul-16

Finance Firm

Review a client's completed counterparty cybersecurity self-assessment before submission, validating responses and ensuring the managed security controls we operate on their behalf were accurately represented.

  • Pre-submission review of a required cybersecurity assessment spanning many questions across nine security domains
  • Cross-checked every response on the maturity scale and corrected data and scoring inconsistencies, with narrative recommendations to strengthen the submission
  • Ensured the identity, endpoint, network, and web application controls managed on the client's behalf were properly credited, giving a more accurate picture of their security posture
  • Documented that the client's web presence is built and maintained under a formal, documented secure-development standard with vulnerability scanning and code-security testing
View details →

2026-Jul-14

Finance Firm

Remediate actively-exploited critical firewall vulnerabilities under urgency: apply interim protection, verify no compromise, and complete a coordinated remote firmware upgrade of the firewall cluster and its managed network devices.

  • Confirmed critical, in-the-wild authentication-bypass vulnerabilities on a high-availability firewall pair and applied the vendor-recommended interim mitigation immediately
  • Reviewed the devices for signs of misuse and confirmed no indication of compromise
  • Planned a staged upgrade path, pre-staged firmware, and scheduled a short weekend maintenance window to minimize disruption
  • Upgraded the firewall pair plus dependent managed switches and wireless access points remotely in a single coordinated session, restoring full cloud logging and monitoring
View details →

2026-Jul-05

Healthcare Firm

Replace six end-of-life wireless access points at a warehouse site, coordinating the physical swap with a remote network engineering team and validating connectivity within a fixed aerial-work-platform window.

  • Pre-survey to confirm access point locations and labeling ahead of the work day
  • Phased, one-at-a-time replacement to preserve partial wireless availability during the swap
  • Per-unit confirmation of controller association and client connectivity with the remote network team
  • Completed all physical replacements and validation within the aerial-work-platform return deadline
View details →

2026-Jul-04

Medical Device Maker

Replace two wall-mounted 34-inch monitors, supervising the on-site cabling work and restoring the wall finish, with final display verification.

  • Removed the existing wall-mounted monitors and repaired the mounting points
  • Installed the new monitors, checking angle and position during mounting
  • Verified the final display on both monitors and confirmed site closure on completion
View details →

2026-Jun-21

Build out the IT infrastructure for a new office over two work days, covering LAN cabling, a compact rack, network devices, video conferencing, and a multifunction printer, with full connectivity testing.

  • Structured cabling from each desk and device position back to a compact rack, terminated to a patch panel
  • Installation of network devices, a wall-mounted meeting-room monitor, and a wireless presentation system
  • Desk-side LAN outlet termination plus multifunction printer installation and network connection
  • Continuity, connectivity, and operational testing, including video-conference and print/scan verification
View details →

2026-Jun-21

Healthcare Firm

Respond to a major website compromise discovered during a planned infrastructure modernization: contain the intrusion, restore essential services, and set a course to rebuild on a hardened, code-free platform.

  • Identified an active web backdoor and hosting-account compromise through log analysis, confirming it pre-dated the engagement
  • Contained the intrusion by disabling server-side code execution and serving a safe maintenance page, ending the outage without reactivating malicious code
  • Restored inbound and outbound email, replaced an expired TLS certificate, and added missing email authentication
  • Scoped credential rotation and a rebuild as a modern static site with no server-side code, eliminating the entire attack class
View details →

2026-May-26

Medical Device Maker

Audit and remediate local administrator access across a Windows endpoint fleet, delivering an audit-defensible attestation package and a repeatable control to prevent privilege drift.

  • Audited local Administrators group membership, the built-in local admin account, and directory-level device-admin roles on every in-scope device
  • Built a repeatable PowerShell detection and remediation workflow producing standardized per-device evidence, consolidated into a single attestation report
  • Scoped Windows LAPS to replace shared local-admin passwords with per-device rotating credentials
  • Recommended converting the one-time audit into a continuous, quarterly-attested control to stop configuration drift
View details →

2026-Apr-29

Design and implement a Microsoft-supported cross-tenant trust between a Japan subsidiary's Microsoft 365 tenant and its overseas headquarters, resolving blocked inter-company email while preserving headquarters security controls and mailbox per user.

  • Diagnosed anti-impersonation filtering as the cause of blocked mail and chose Microsoft's intended cross-tenant affiliate pattern over a costly dual-mailbox workaround
  • Configured full email authentication (SPF, DKIM, DMARC) and migrated the domain's DNS to a modern DNSSEC-capable provider, with DMARC monitoring
  • Established directory cross-tenant access settings on both tenants and coordinated a trusted-domain entry to stop false impersonation flags
  • Added forced-TLS partner connectors and cross-tenant Teams collaboration, with a runbook for periodic review
View details →

2026-Apr-17

Medical Device Maker

Execute the IT scope of an office relocation under a compressed schedule, covering LAN, rack, circuits, equipment move, and desk setup, with phased decommissioning of the legacy site.

  • Multi-vendor coordination across carriers, cabling, logistics, AV, and MFP over a six-month timeline
  • Phased equipment move via warehouse staging, enabling temporary workspace before full infrastructure readiness
  • Structured cabling, rack mount, and wireless AP installation with port-level continuity and connectivity testing
  • New-site circuit installation and cutover (Internet, WAN/VPN, telephony, FAX)
  • Large-format monitor and MFP setup including uniFLOW and FAX forwarding configuration
  • Legacy site decommissioning, including rack disposal and removal of all carrier services
View details →

2026-Apr-15

Asset Management Firm

Execute the IT scope of an office relocation to a new-build site, covering LAN, racks, circuits, equipment move, and workstation setup, coordinated over 8 months across three carriers to a fixed go-live date.

  • Weekly IT meetings, construction-meeting participation, and bilingual coordination with carriers, cabling, AV, and design vendors
  • Site surveys and circuit installation with three carriers, including telephony and FAX migration
  • Structured cabling, rack mounting, and AP installation across desks, meeting rooms, town hall, phone booths, and signage
  • Pre-cabling to navigate physical constraints (AV control panels routed through ceiling and partitions)
  • Network equipment relocation (switches, routers, UPS, APs) with serial-number tracking, plus existing-equipment move
  • Workstation peripheral setup and final pre-go-live readiness checks
View details →

2026-Apr-02

Finance Firm

Diagnose and fix a severe office WiFi throughput collapse, restoring wireless speeds through firewall policy tuning and access-point optimization.

  • Investigated a slowdown that had cut throughput to a small fraction of the wired network on the same site
  • Root-caused redundant firewall inspection profiles consuming capacity, and client devices defaulting to the congested 2.4 GHz band
  • Removed the ineffective inspection profiles while keeping web, application, and DNS filtering active; enabled band steering, wider channels, and automatic channel management; and brought offline access points back online
  • Restored throughput by roughly 24x over the reported baseline with no reduction in meaningful security, plus guidance on secure versus legacy SSID use
View details →

2026-Mar-10

Finance Firm

Audit a newly launched bilingual corporate site that shipped with no SEO infrastructure and implement a major, site-wide technical SEO foundation across its Japanese and English pages.

  • Built the crawl and indexing infrastructure the site lacked: a dynamic robots.txt, a CMS-driven sitemap, and an llms.txt for AI search engines
  • Added event-driven search-engine notification (IndexNow and indexing APIs) so affected pages are submitted on publish or deploy
  • Fixed page-level SEO at scale — unique bilingual meta descriptions across every route and team profile, corrected headings, image alt text, and titles
  • Implemented bilingual structured data, hreflang, and canonical URLs, plus a large set of legacy URL redirects to preserve ranking authority
View details →

2026-Mar-06

Finance Firm

Harden a client website's edge web application firewall by layering a known-good probe-blocking ruleset over managed rules, while fixing search-engine crawler access.

  • Deployed a custom rule set that verifies legitimate bots and SEO-critical files first, then blocks probes, scanners, and abusive crawlers
  • Cut hundreds of malicious probe requests within hours — traffic that previously reached the origin
  • Used edge observability to make attack traffic visible, then blocked common vulnerability probes before they reached the origin
  • Tuned crawler rules so all verified search bots pass cleanly, with no impact on legitimate visitors
View details →

2026-Feb-21

Finance Firm

Migrate a bilingual corporate website to an edge compute platform with zero downtime and a retained rollback path, gaining server-side observability and stronger edge protection.

  • Completed a staged, zero-downtime cutover of production and staging, keeping the previous deployment as a rollback option
  • Gained real-time logging, request-level tracing, and smart placement — the driver for the move
  • Used the new visibility to surface automated scanners and responded with bot protection and WAF hardening, while keeping legitimate crawlers working
  • Improved bilingual language detection and delivered follow-up SEO, reliability, and least-privilege CI/CD hardening
View details →

2025-Nov-03

Asset Management Firm

Migrate from legacy MDM environment to Microsoft 365 Intune integrated with Apple Business Manager, implementing zero-touch deployment and conditional access policies to strengthen mobile device security posture.

  • Automated device enrollment via zero-touch deployment
  • Remote wipe capability for lost or stolen devices
  • Conditional access policies ensuring security-compliant devices can access corporate resources
  • Coordinated scheduling and timely migration with minimal business disruption
View details →

2025-Oct-20

Healthcare Firm

Deploy mission-critical enterprise UPS system at a warehouse in Heiwajima to protect essential network infrastructure supporting distribution operations, with multi-floor installation and rapid issue resolution.

  • High-capacity lithium-ion Smart-UPS units with modular battery systems across server room and warehouse floors
  • Precision rack mounting with PDU integration and power verification
  • Network Management Card configuration enabling remote monitoring and alert management
  • Comprehensive startup service with operator training on emergency procedures
  • Same-day resolution of DOA battery modules through expedited RMA coordination
  • Full system validation and handover within 72-hour installation window
View details →

2025-Oct-01

Asset Management Firm

Migrate from hybrid Configuration Manager environment to cloud-native provisioning using Windows Autopilot, eliminating on-premises dependency and executing new device staging and rollout with pre-applied security policies.

  • Transition to cloud-native setup environment
  • Location-independent device deployment capability
  • Security policies pre-applied at delivery to end users
  • Coordinated scheduling and timely migration with minimal business disruption
View details →

2025-Sept-16

Healthcare Firm

Complete wireless network infrastructure deployment across warehouse facility, including AP installations, server rack setup, and printer port connections across multiple floors totaling 50 access points.

  • 50 wireless access points installed
  • 20 printer ports terminated and tested
  • Server rack relocation and installation on a separate floor with anchor mounting
  • Specialized freezer room antenna installation with panel-type hardware
  • Multiple CHINO unit connections (additional scope items)
  • Coordinated multi-vendor activities including construction team and facilities
  • Site-specific challenges resolved including cable routing and label discrepancies
View details →

2025-Sept-12

Medical Device Maker

Manage comprehensive IT equipment shutdown and startup during planned electrical infrastructure upgrades at a Tokyo distribution facility, ensuring zero data loss and business continuity across warehouse operations and administrative systems.

  • Pre-shutdown validation of all network equipment, servers, and endpoints
  • Coordinated power-down sequence for multi-floor infrastructure including server room equipment
  • Complete startup and verification of enterprise UPS system, network infrastructure, and production servers
  • Systematic testing of wired/wireless connectivity, VoIP phones, and multifunction printers
  • FAX send/receive functionality verification and time-recording system validation
  • Remote standby support for first business day post-maintenance
View details →

2025-Jul-31

Asset Management Firm

Led IT project management and infrastructure buildout for expansion to additional floor within same building, collaborating with client's global IT team to plan and execute user relocation within a single weekend.

  • Dual fiber-optic lines installed for primary and backup connectivity with redundancy
  • LAN cabling throughout expansion area
  • AV system deployment and office equipment installation
  • Full workstation setup enabling users to resume work immediately
  • Hands-on migration support for user floor relocation
View details →

2025-Jun-20

Asset Management Firm

Replace faulty meeting room HDMI media converter and cabling, installing new underfloor HDMI cable run and automatic Crestron switcher for improved AV connectivity and reliability.

  • Underfloor HDMI cable installation from IT cabinet to meeting table
  • Crestron HD-MD4X1-4K-E automatic HDMI switcher installation and mounting
  • Dual HDMI connection points with automatic input switching capability
  • System testing and configuration verification
View details →

2025-Jun-02

Asset Management Firm

Provide IT support for major investor-facing event, managing pre-event validation and day-of operations for network connectivity, AV equipment, and presentation systems to ensure stable IT environment for executives and external attendees.

  • Pre-event validation of venue network connectivity
  • Day-of operations for AV equipment and presentation systems
  • Rapid issue resolution during event
  • Smooth event proceedings support
View details →

2025-Mar-01

Finance Firm

Perform IT equipment shutdown and restart, during annual planned building power outage.

  • Equipment check and shutdown
  • Perform 2400VA PBX replacement
  • Reconnection and startup
  • Old equipment removal from rack and decommissioning
View details →

2024-Nov-27

Asset Management Firm

Perform additional memory installation for redundant Cisco 8300 router as continuation of network infrastructure upgrade, coordinating with client network team for equipment removal, memory card installation, and system verification.

  • Memory card installation for second Cisco 8300 router
  • Network cable labeling and documentation before unracking
  • Equipment removal and precision memory module installation
  • System remounting with power and network reconnection
  • Network team verification of router operation and startup
View details →

2024-Oct-15

Finance Firm

Handle all aspects of IT for an urgent office move for a Tokyo-based startup, performing PM and vendor coordination.

  • Infra design emphasizing security but with superior cost-performance
  • Structured cable, system rack with environment monitoring and, redundant UPS and Internet
  • Fortinet firewalls, switches, and wireless
  • Poly IP desk phones connect to a voice gateway
  • Several conference rooms kitted with a Logitech VC system for Zoom meetings
  • Various end-user systems built and installed
View details →

2024-May-13

Law Firm

Handle all aspects of IT install or upgrade for office move in Tokyo, within the same building to consolidate space, performing project management and coordination of move vendors vis-à-vis IT, reporting to HQ IT.

  • Structured LAN cabling (floor and vertical)
  • Large, redundant UPS deployment
  • Wireless install and test
  • Network including site-to-site VPN to HQ and DC deployment
  • Phone system test after 3rd party migration
  • Multi-function printers install and test
  • Video conferencing system design, install and test
  • Physical security and CCTV system design, install and test
  • Various new peripherals for end-users and others
View details →

2023-Sept-01

Energy Management Control Solution Firm

Small office setup in Yokohama, including fiber line and ISP arrangements, mini-rack and UPS, Fortinet FortiWifi with VPN connection to client's infrastructure, Poly Teams Room videoconferencing, workstations, and Fujifilm printer / fax.

View details →

2023-Aug-25

Steel Wire Technology Maker

Relocated warehouse ceiling cables for wireless access points and printers, to factory office area, performed troubleshooting on due to poor performance shown by cable test. Discovered water damage to cables, attempted to clean it up, and replaced cable as needed.

View details →

2023-Aug-25

Asset Management Firm

Install a dual display stand kit, mount displays, tidy up cables.

View details →

2023-Aug-07

Asset Management Firm

Deploy 3 Nutanix devices for cloud service unification.

View details →

2023-Jul-27

Energy Management Control Solution Firm

Coordinate site survey prior to NTT fiber line installation, take photos to show relevant site details.

View details →

2023-Jul-04

Law Firm

Steward removal of Colt fiber line and related equipment, tidy cables, update documentation.

View details →

2023-May-26

Steel Wire Technology Maker

Perform IT equipment shutdown and restart, during annual planned building power outage, coordinate PBX maintenance, and remove old server and UPS equipment from rack for decommissioning.

View details →

2023-May-26

Asset Management Firm

Replace existing ceiling-mounted Cisco wireless access points, and deploy additional new in data center.

View details →

2023-Apr-29

Medical Device Maker

Steward IT equipment power off and power up, and operational validation, for planned annual building power maintenance.

View details →

2023-Mar-31

Asset Management Firm

Replace ceiling-mounted wireless access point, patch to specific switch port, validate connectivity for guest and company Wifi. Additionally, trace LAN cable for a later task.

View details →

2023-Mar-19

Medical Device Maker

Shutdown and restart all IT equipment at warehouse / distribution center, due to planned annual power maintenance. Validate all IT and business operational functions for regular business starting the next day.

View details →

2023-Feb-11

Law Firm

Steward IT equipment shutdown and restart, during planned regular power outage at Tokyo site building. Remove decommissioned equipment, tidy up cables.

View details →

2023-Jan-24

Law Firm

Deploy 2 new FortiGate 101F firewalls and a new OpenGear to allow HQ IT remote access. Assist validation, then remove equipment to be decommissioned.

View details →

2022-Nov-11

Law Firm

Perform audio visual system demo, to evaluate difference between Logicool Rally Plus vs Rally Bar.

View details →

2022-Nov-07

Medical Device Maker

Steward shutdown and restart of IT equipment for annual planned building power cycle, then validate all business systems such as fax order entry.

View details →

2022-Oct-22

Asset Management Firm

Convert conference room video conferencing system from Cisco Webex Video to MS Teams, installing Lenovo ThinkSmart core kit for MS Teams and touchpad controller, ClearOne ceiling microphone, ceiling speakers, Huddly L1 camera and removing Webex all-in-one kit and its touchpad.

View details →

2022-Sept-29

Steel Wire Technology Maker

Install APC Smart-UPS 3000 RM UPS Replacement, including shutting down connected servers and devices, disconnect and reconnect, configure management card, re-start and validation.

View details →

2022-Sept-09

Asset Management Firm

Annual disaster recovery test, Bloomberg Software and Laptop imaging, pre- and post-failover.

View details →

2022-Sept-08

Law Firm

New edge router deployment and remote access console connection.

View details →

2022-Sept-03

Medical Device Maker

Re-mount existing wall-mounted conference room 75-inch monitor and install additional 43-inch monitor for AV system.

View details →

2022-Jul-30

Asset Management Firm

Cisco switch replacement work for DMZ security improvement.

View details →

2022-Jun-11

Analytical Instruments Maker

Perform Windows update patching for on-premise Servers, patch firmware on network and security devices.

View details →

2022-May-02

Asset Management Firm

Steward PBX migration to new model and desk phones.

View details →

2022-Apr-17

Medical Device Maker

Steward annual datacenter blackout over weekend, with IT equipment shutdown, restart and troubleshooting.

View details →

2022-Apr-12

Steel Wire Technology Maker

Warehouse core switch replacement project.

View details →

2022-Apr-06

Steel Wire Technology Maker

Tokyo office core switch replacement project.

View details →

2022-Apr-06

Medical Device Maker

Office ceiling-mount wireless access point swap to new model.

View details →

2022-Apr-05

Law Firm

Pulse security device outage and emergency replacement stewardship.

View details →

2022-Mar-21

Medical Device Maker

Japan distribution center Kardex Remstar shuttle deployment project - launch preparation (LAN, printers, desk moves).

View details →

2022-Mar-08

Law Firm

Supervised APC support vendor to replace the intelligence module in Symmetra UPS, and de-rack three devices for decommissioning.

View details →

2022-Feb-11

Analytical Instruments Maker

Windows Server update patching, Firewall and network device firmware updates.

View details →

2022-Jan-15

Asset Management Firm

Handle annual power outage shutdown and restart, troubleshooting door security, new UPS, PBX voicemail.

View details →

2022-Jan-15

Asset Management Firm

Steward annual building blackout, IT equipment shutdown, restart and troubleshooting.

View details →

2022-Jan-08

Medical Device Maker

Japan distribution center Kardex Remstar shuttle deployment project - LAN installation.

View details →

2021-Nov-29

Law Firm

Tokyo server room UPS battery and PDU troubleshooting - XR Frame and battery unit replacement.

View details →

2021-Oct-22

Asset Management Firm

Annual disaster recovery test - pre- and post-failure IT operations.

View details →

2021-Oct-21

Law Firm

Troubleshoot Server Room UPS battery problem after burning smell detected.

View details →

2021-Aug-26

Law Firm

"Local hands and eyes" assist for Cisco ISE software upgrade after breakfix.

View details →

2021-Aug-02

Healthcare Firm

Launch of website to allow registration by healthcare professionals nationwide to participate in order entry system, including site and page design, anti-spam security, database design, furigana-romaji conversion API development, invitation email, operational workflow design on backend.

View details →

2021-Jul-31

Medical Device Maker

Handle all aspects of office move to another building within Tokyo, including project management, and coordination of move, along with installs or upgrades to all IT infrastructure aspects, including LAN cabling, wireless, network, phone system, multi-function printers, video conferencing system.

View details →

2021-Jul-17

Medical Device Maker

Handle all aspects of office move in Tokyo, within the same building to downsize space, performing project management and coordination of move vendors vis-à-vis IT. Major activity was installations or upgrades for all IT infrastructure aspects, including LAN cabling, wireless, network including site-to-site VPN to HQ and DC, phone system, multi-function printers, video conferencing system, fax server system, various new peripherals for end-users and others.

View details →

2021-Jun-30

Law Firm

Handling urgent Cisco ISE device troubleshooting, warranty hardware breakfix and secure disposal.

View details →

2021-Feb-18

Law Firm

Backup storage server unexpected outage. Stewarded fix with hardware engineer to replace needed parts.

View details →

2021-Feb-08

Healthcare Firm

Completed major project to develop, test and launch an order entry system for physicians to order genetic tests online, based on our PROdb cloud database system.

View details →

2021-Jan-20

Medical Device Maker

Mini LAN construction for minor equipment rearrangement at warehouse.

View details →

2021-Jan-17

Steel Wire Technology Maker

Breakfix for server RAID array HDD hardware failure. Server is out of warranty, so we arranged an appropriate spare, purchasing from old stock for that model.

View details →

2020-Oct-21

Car Parts Maker

Japan network is unstable due to Dell switch hardware problems. Stewarded a replacement of the core switches over multiple troubleshooting sessions, with full IT functionality re-validation.

View details →

2020-Oct-15

Healthcare Firm

Build and Launch of localized marketing website, integration with eSolia cloud database PROdb.

View details →

2020-Sept-17

Real Estate Finance Management

Installation of new LAN Cabling on and between floors, to allow modern IP phone system to be deployed.

View details →

2020-Aug-05

Electron Microscope Maker

Steward a Major Incident regarding a Network Outage (WAN provider line outage).

View details →

2020-Mar-08

Medical Device Maker

Steward annual fire-code power outage IT shutdown, restart and re-validation, as well as Canon multi-function printer/copier move.

View details →

2020-Feb-26

Law Firm

De-rack backup server and prepare for HDD sendback and main unit disposal, troubleshoot UPS PDU, followup HVAC problem.

View details →

2020-Feb-19

Medical Device Maker

Structured LAN cabling related to warehouse expansion, move multi-function copier from floor to floor, and troubleshoot 3 wireless AP certificate issues.

View details →

2020-Feb-15

Analytical Instruments Maker

Perform regular Windows patch updates on servers, signature updates for anti-virus, and firmware update on Firewall. Install, test, validate the everyday functionality after the updates as a QC step.

View details →

2020-Feb-06

Asset Management Firm

Videoconferencing system unneeded parts and cable removal, replacement work.

View details →

2020-Feb-02

Electron Microscope Maker

Cisco Unified Call Manager HQ Update, local branch IP Phone operation validation (inbound call, outbound call, voicemail save and retrieve, call hold and transfer, desktop phone screen and LED indicators).

View details →

2020-Jan-18

Asset Management Firm

Steward annual fire-code power outage IT shutdown, restart and re-validation, as well as wall mount display construction.

View details →

2019-Dec-19

Real Estate Finance Management

Coordinate new Giga-class Internet line installation at sister sites, switchover office connection

View details →

2019-Dec-18

Law Firm

Coordinate new WAN line installation (NTT fiber and Colt ONU), switch from old fiber to new

View details →

2019-Dec-15

Asset Management Firm

Replace videoconferencing equipment with new Cisco VC devices in two large meeting rooms, perform construction to mount two large-screen monitors on walls

View details →

2019-Nov-18

Law Firm

Deploy new backup server (rackmount, connect), photograph and report

View details →

2019-Nov-07

Electron Microscope Maker

Switched office WAN user traffic from Orange to AT&T Circuit, then re-validated all aspects of IT

View details →

2019-Oct-16

Steel Wire Technology Maker

Deploy replacement Fortinet 100E Firewall, troubleshooting with remote engineer to ensure office Internet speed same or better, validating as needed

View details →

2019-Oct-12

Analytical Instruments Maker

Perform regular Windows update on servers, signature update for anti-virus, and firmware update on Firewall. Install, test, validate daily functionality.

View details →

2019-Oct-11

Securities Firm

Steward IT shutdown and restart during planned annual building power cycle and testing, working around system migration to Amazon AWS cloud

View details →

2019-Oct-02

Steel Wire Technology Maker

Coordinate backup tape drive unit replacement for continually failing device, gracefully shutting down and restarting virtual servers, testing and validating

View details →

2019-Oct-02

Medical Device Maker

Deploy Riverbed SteelConnect in datacenter to enhance SD-WAN performance and redundancy, including rack mounting and cabling changes

View details →

2019-Oct-01

Medical Device Maker

Manage project for Japan VAT change from 8% to 10% in Navision ERP system, perform validation tests required by compliance related to calculations and client-facing output

View details →

2019-Sept-23

Healthcare Firm

Multi-day office layout change equipment move, pull new and remove old cable, re-connect and system validation

View details →

2019-Aug-02

Analytical Instruments Maker

Steward system shutdown and restart for annual power maintenance and tests in Yokohama building, IT systems test and daily-use validation

View details →

2019-Jul-25

Electron Microscope Maker

ATT WAN circuit activation and Cisco router and switch re-routing after office hours

View details →

2019-Jul-06

Medical Device Maker

High-end Projector Installation and Room-to-Room Display Relocation Construction

View details →

2019-Jun-18

IT Services Firm

Datacenter Device Removal Work from 5 racks, in preparation for move

View details →

2019-May-31

Medical Device Maker

Replace old VC system with Polycom Real Presence 310 and validation of connection to several sites

View details →

2019-May-25

Medical Device Maker

Steward annual power outage of office, including startup, test and daily use validation and Hyper-V and VPN failure troubleshooting

View details →

2019-May-25

Electron Microscope Maker

Steward annual power outage system shutdown and restart, test and daily use validation and old firewall failure troubleshooting and break-fix

View details →

2019-May-09

Electron Microscope Maker

New Router Install x2 and ATT Fiber Line Implementation

View details →

2019-Apr-25

Law Firm

Remove Decommissioned Citrix NetScaler Appliance, and re-rack surrounding equipment to make earthquake proof.

View details →

2019-Apr-24

Law Firm

Site Survey and planning for 18-year-old out-of-warranty structured cabling replacement project.

View details →

2019-Apr-13

Asset Management Firm

Structured cabling tidy-up work during planned power cycle event.

View details →

2019-Mar-13

IT Services Firm

Breakfix for failed Yamaha RTX 1210 router/firewall, rewrite of configuration to use latest OS commands.

View details →

2019-Mar-10

Medical Device Maker

Steward annual power maintenance of IT for distribution center / warehouse, including startup, test and daily use validation after power up.

View details →

2019-Mar-05

Law Firm

Perform rack-mount and connection of Dell SecureWorks iSensor appliance, working with HQ IT team to test and validate.

View details →

2019-Mar-02

Asset Management Firm

Steward IT Equipment Shutdown, Restart & Validation, along with some documentation refresh and tidy-up, during Building's Annual Planned Power Outage

View details →

2019-Feb-24

Medical Device Maker

Perform office layout change including display mount construction, LAN cabling and move of IT-related devices. Install, test, validate.

View details →

2019-Feb-22

Asset Management Firm

Perform IT coordination for internal office layout change, working with furniture and moving vendors, as well as staff (Phase 1)

View details →

2019-Feb-16

Electron Microscope Maker

Work with WAN network provider to plan and install router iOS Adaptive QoS Vulnerability security patch.

View details →

2019-Feb-16

Analytical Instruments Maker

Perform regular Windows update on servers and firmware update on Firewall. Install, test, validate daily functionality

View details →

2019-Feb-15

Intellectual Property Support Firm

Work with Serviced Office to Steward Client IT Equipment Shutdown, Restart & Validation, along with some documentation upgrades, during Building's Annual Planned Power Outage

View details →

2019-Feb-13

Medical Device Maker

System test for new medical product launch.

View details →

2019-Feb-10

Law Firm

Steward IT Equipment Shutdown, Restart & Validation, along with some documentation upgrades and decommissioned system planning, during Building's Annual Planned Power Outage

View details →

2019-Jan-26

Medical Device Maker

Steward IT Equipment Shutdown, Restart & Validation, along with some documentation upgrades and old VC system planning, during Building's Annual Planned Power Outage

View details →

2019-Jan-23

Medical Device Maker

RightFAX fax server & gateway device weekend replacement, cut-over and validation at KDDI data center

View details →

2019-Jan-22

Asset Management Firm

Raritan KVM device cable tidy-up, organization and labeling, reconnection

View details →

2019-Jan-20

Asset Management Firm

Steward IT Equipment Shutdown, Restart & Validation, along with documentation upgrades, switch cable cleanup, and troubleshooting for VC system voice or speaker and phone system Hold problem

View details →

2019-Jan-19

Medical Device Maker

Wall-Mounted Presentation Display Relocation, Reconnection, Validation

View details →

2018-Dec-27

Medical Device Maker

New Telecommunication-related Product Market Entry Discussion and Research

View details →

2018-Dec-14

Law Firm

UPS Power Distribution Unit Password Reset and Reconfiguration

View details →

2018-Nov-22

Public Works Firm

User Access Violation Security Audit

View details →

2018-Nov-21

Medical Device Maker

New EDI Server Upgrade, Re-Validation

View details →

2018-Nov-16

Asset Management Firm

Research and Confirm Viability of Firm's Global Standard UPS Usage in Japan

View details →

2018-Nov-15

Electron Microscope Maker

New AT&T Carrier VPN Line and Device Install, Service Turn-up

View details →

2018-Nov-12

Analytical Instruments Maker

Steward IT Equipment Shutdown, Restart & Validation, along with some upgrades, during Building's Annual Planned Power Outage

View details →

2018-Nov-11

Medical Device Maker

Steward IT Equipment Upgrade, Shutdown, Restart & Validation, Troubleshooting, during Building's Annual Planned Power Outage

View details →

2018-Nov-08

Asset Management Firm

New Office Pre-Construction Site Survey for Structured Cabling and Security System

View details →

2018-Nov-04

Medical Device Maker

Steward IT Equipment Shutdown, Restart & Validation during Building's Annual Planned Power Outage

View details →

2018-Nov-04

Fashion Retailer

Relocation work for Marunouchi retail shop and related IT equipment

View details →

2018-Oct-29

IT Services Firm

Cloud database refactoring and enhancement, adding categories to managed documents for better filtering and reporting

View details →

2018-Oct-22

Steel Wire Technology Maker

Tokyo WAN failover test and validation with Proximus Co., reporting.

View details →

2018-Oct-19

Medical Device Maker

Migrate from old Active Directory and File/Print server, validate and document security compliance

View details →

2018-Oct-14

Real Estate Finance Management

Steward IT Equipment Shutdown and Restart during Building's Annual Planned Power Outage ('tis the season)

View details →

2018-Oct-06

Financial Advisory Firm

Steward IT Equipment Shutdown and Restart during Building's Annual Planned Power Outage

View details →

2018-Sept-30

Medical Device Maker

Internal office desk move for about 20 users

View details →

2018-Sept-15

Analytical Instruments Maker

Apply Updates and Patches to Windows Servers, and Firmware Update to Firewall, and re-validate all functions

View details →

2018-Sept-12

IT Services Firm

Cloud database enhancement, scripting extraction of future-proof markdown text files from Documents data via API, and committing these to source code control for version comparison.

View details →

2018-Sept-08

Financial Advisory Firm

Replace old multifunction devices (printer, copier, scanner) with new models, setup, and test copying, printing and scanning to email and file server folder

View details →

2018-Sept-07

Electron Microscope Maker

Urgent Upgrade of Orange IPANEMA network device

View details →

2018-Sept-05

Fashion Retailer

Retail Shop device and circuit relocation work in Okayama, number 2

View details →

2018-Sept-04

Fashion Retailer

Troubleshoot IP Cameras (Traffic Counters) at Retail Shop in Yokohama

View details →

2018-Aug-22

Analytical Instruments Maker

Connect Sales Office WAN via Sophos Firewall Appliance

View details →

2018-Aug-06

Electron Microscope Maker

ISR Router Replacement triggered by Cisco Field Notice

View details →

2018-Jul-21

Asset Management Firm

Cisco Core switch replacement

View details →

2018-Jul-06

Steel Wire Technology Maker

Fortinet Firewall appliance implementation and rack cable cleanup

View details →

2018-Jul-03

Fashion Retailer

Retail shop IT device and Internet circuit relocation in Okayama

View details →

2018-Jun-22

Medical Device Maker

Distribution center recovery construction after mezzanine removal.

View details →

2018-Jun-16

Asset Management Firm

Preparation and Execution of Network Addressing Change and Upgrade 2, Security Audit and Rectification, New FortiNet Firewall Installation

View details →

2018-Jun-15

Analytical Instruments Maker

Security Design, then Sophos Firewall Appliances Configuration, Install and Integration, at Japan HQ and Satellite Sites

View details →

2018-Jun-11

Medical Device Maker

PM for Navision ERP and Infrastructure upgrade

View details →

2018-Jun-03

Financial Advisory Firm

Preparation and Execution of Network Addressing Change and Upgrade, Security Audit and Rectification, New FortiNet Firewall Install

View details →

2018-May-22

Electron Microscope Maker

Windows Domain and Email 'PC Migration' Project driven by Company Acquisition

View details →

2018-May-19

Analytical Instruments Maker

Apply Microsoft update patches on server in Yokohama office

View details →

2018-May-16

Steel Wire Technology Maker

WAN redundancy failover test with Proximus

View details →

2018-May-12

Medical Device Maker

Reception TV Mount Construction and Rear Entrance Phone Cabling and Install

View details →

2018-Apr-21

Asset Management Firm

VC Wall-mount TV and Core Switch Replacement Construction

View details →

2018-Apr-20

Fashion Retailer

Hiroshima Retail Outlet Store Opening

View details →

2018-Apr-13

Medical Device Maker

Distribution Center Internal Moves, Wifi and Network Construction Activities, due to Japan Fire Code changes

View details →

2018-Mar-21

Electron Microscope Maker

Lab Showroom Lighting Construction and Flooring Fix

View details →

2018-Mar-18

Medical Device Maker

Annual Power Cycle and Maintenance

View details →

2018-Mar-03

Medical Device Maker

Offsite WebEx Meeting Setup Support for Conference

View details →

2018-Feb-11

Law Firm

Annual Power Outage System Shutdown and Restart, Equipment Decommissioning

View details →

2018-Jan-27

Medical Device Maker

Internal office desk move for about 70 users

View details →

2018-Jan-26

Asset Management Firm

Install a new wireless access point to replace their current consumer class one

View details →

2018-Jan-23

Medical Device Maker

International IP Phone Service cutover to local IP Phone Service from Denphone.

View details →

2018-Jan-20

Analytical Instruments Maker

Additional LAN Cable Installation Project

View details →

2018-Jan-13

Medical Device Maker

Internal Office Layout Change and Cabling

View details →

2018-Jan-11

Analytical Instruments Maker

Secure Windows server "inherited" from other vendor, by applying years worth of patches

View details →

2017-Dec-26

Medical Device Maker

Research Toll Free 0120 "FreeDial" Number Options

View details →

2017-Dec-08

Medical Device Maker

Cutover Tokyo Firewall from Virtual to Physical

View details →

2017-Dec-05

Law Firm

Remove Previous PBX Equipment from Rack and Prep for Send-back

View details →

2017-Dec-03

Law Firm

Security Appliance Installation / HDD Destruction

View details →

2017-Nov-26

Intellectual Property Support Firm

Remove LAN Cable post-move

View details →

2017-Nov-17

Intellectual Property Support Firm

Office Move Project

View details →

2017-Nov-13

Analytical Instruments Maker

Planned Power Maintenance and Windows Update on Servers

View details →

2017-Nov-10

Analytical Instruments Maker

Cisco SX10 Videoconference System Installation

View details →

2017-Nov-10

Securities Firm

Replace Switches and Upgrade SonicWall Firewall Firmware

View details →

2017-Oct-20

Intellectual Property Support Firm

Internet Connection Construction and Media Converter Installation

View details →

2017-Oct-19

Law Firm

Cisco Video-conference System (MX300) Installation

View details →

2017-Oct-04

Law Firm

Install "Pure Storage" Array HBA Cards to Prep for EMC Replacement

View details →

2017-Sept-29

Steel Wire Technology Maker

Border Router Replacement

View details →

2017-Sept-11

Medical Device Maker

Deploy 2nd Palo Alto Firewall

View details →

2017-Aug-11

Analytical Instruments Maker

Windows update and patch for server

View details →

2017-Jul-25

Asset Management Firm

Disaster Recovery Site Raritan Device Replacement

View details →

2017-Jul-22

Analytical Instruments Maker

New Server Installation

View details →

2017-Jul-18

Medical Device Maker

Initial Quick Launch of "Council for Clinical Use of Ventricular Assist Device Related Academic Societies, IMPELLA committee" Japanese-language Website

View details →

2017-Jul-01

IT Services Firm

Patch Cabling Replacement in Server Room

View details →

2017-Jun-13

Law Firm

New cabling for Wireless AP & Conference room

View details →

2017-May-25

Asset Management Firm

Security device replacement, de-rack re-rack

View details →

2017-Apr-11

Steel Wire Technology Maker

WAN equipment replacement, backup circuit upgrade, network firmware upgrades

View details →

2017-Jan-05

Electron Microscope Maker

Major office and lab construction, office move and consolidation

View details →

2016-Oct-17

Medical Device Maker

Partially-Furnished Office Move Project

View details →

2012-Apr-28

Law Firm

Tokyo DC Refresh and Earthquake Proofing, and APC Symmetra UPS Replacement

View details →

2012-Apr-14

Electron Microscope Maker

New AV Video Conference Equipment Construction

View details →

2012-Apr-05

Electron Microscope Maker

New AV Video Conference Equipment Construction Prep

View details →

2012-Mar-13

Electron Microscope Maker

Perform Site Survey for New AV Video Conference Equipment Construction

View details →

2012-Mar-08

Medical Device Maker

Create an Independent Direct Number and Voicemail Box for HR

View details →

2012-Mar-04

Electron Microscope Maker

New Wireless Access Points and Controllers

View details →

2012-Mar-01

Steel Wire Technology Maker

Pre-cabling Site Survey

View details →

2012-Feb-28

Medical Device Maker

Logistics Center LAN Cabling Relocation, Re-pull Work

View details →

2006-Aug-01

Medical Device Maker

Japan PM for Rollout of BaaN ERP and ARGO21 EDI to replace Legacy AS/400 System

View details →