IT Project — 2026-Jun-21
Build out the IT infrastructure for a new office over two work days, covering LAN cabling, a compact rack, network devices, video conferencing, and a multifunction printer, with full connectivity testing.
- Structured cabling from each desk and device position back to a compact rack, terminated to a patch panel
- Installation of network devices, a wall-mounted meeting-room monitor, and a wireless presentation system
- Desk-side LAN outlet termination plus multifunction printer installation and network connection
- Continuity, connectivity, and operational testing, including video-conference and print/scan verification